BIPM Time Department Data Base | |||||
|
|
Calibration trip (Cal_ID) information | GALILEO calibration results (ns) | Applied in CGGTTS | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Report | Laboratory | Receiver BIPM ID | Date Calib | Author | Calib. trip type | Delays from calibration trip | Calibration uncertainties | ||||||||||
up|down | CAB | REF | INT E1 | INT E5a | SYS E1 | SYS E5a | TOT E1 | TOT E5a | uCal0 (E1) | uCal0 (E5a) | ΔuCAL | ||||||
1012-2021 | CNES | CS21 | 2021-02-03 | LNE-SYRTE | G2 with closure | 166.2 | 157.4 | 58.2 | 64.3 | 2.5 | 0.0 | ||||||
1012-2021 | CNES | CS22 | 2021-02-03 | LNE-SYRTE | G2 with closure | 176.1 | 157.1 | 58.0 | 64.8 | 2.5 | 0.0 | ||||||
1012-2021 | CNES | CS23 | 2021-02-05 | LNE-SYRTE | G2 with closure | 118.3 | 56.8 | 33.3 | 30.7 | 2.5 | 0.0 | ... | |||||
1012-2021 | CNES | CS24 | 2021-02-05 | LNE-SYRTE | G2 with closure | 118.5 | 57.0 | 36.9 | 37.2 | 2.5 | 0.0 | ... | |||||
1012-2021 | LUX | LU01 | 2021-03-03 | LNE-SYRTE | G2 with closure | 118.0 | 36.5 | 29.9 | 29.6 | 2.5 | 0.0 | ... | |||||
1012-2021 | LUX | LU02 | 2021-03-03 | LNE-SYRTE | G2 with closure | 160.6 | 38.6 | 32.7 | 30.7 | 2.5 | 0.0 | ... |
Calibration trip (Cal_ID) information | BEIDOU calibration results (ns) | Applied in CGGTTS | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Report | Laboratory | Receiver BIPM ID | Date Calib | Author | Calib. trip type | Delays from calibration trip | Calibration uncertainties | ||||||||||||||||
up|down | CAB | REF | INT B1C | INT B2a | SYS B1C | SYS B2a | TOT B1C | TOT B2a | uCal0 | uCal0 | ΔuCAL | ||||||||||||
<< No result found >> |
Home | FTP results | API UTC | Sitemap | Contact us | Webmaster |